General Information
Completion: | 1978 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Structure: |
original configuration: Box girder bridge original configuration: Haunched girder bridge current configuration: Four-span extradosed bridge |
Location
Location: |
Kimry, Tver (oblast), Central Federal District, Russia |
---|---|
Crosses: |
|
Coordinates: | 56° 52' 22.99" N 37° 21' 54.83" E |
Technical Information
Dimensions
total length | 904.9 m | |
total width | 19.5 m | |
roadway / carriageway width | 15 m | |
walkway width | 2 x 2.25 m | |
main bridge | ||
---|---|---|
total length | 554.4 m | |
main spans | 2 x 128 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
steel
|
abutments |
reinforced concrete
|
Chronology
2004 — 2008 | Because of excessive sagging, the bridge is strengthened by adding cable-stays to the cantilevering sections of the main spans. |
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Finding new strength. In: Bridge Design & Engineering, v. 14, n. 50 (1st Quarter 2008), pp. 54-55. (2008):
- About this
data sheet - Structure-ID
20035492 - Published on:
13/03/2008 - Last updated on:
06/05/2023