0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Nyerere Bridge
Beginning of works: February 2012
Completion: 16 April 2016
Status: in use

Project Type

Location

Location: ,
Coordinates: 6° 51' 32.90" S    39° 17' 59.44" E
Show coordinates on a map

Technical Information

Dimensions

main span 200 m
width 27.5 m
length 680 m
number of lanes 2 x 3

Materials

piers reinforced concrete
mast reinforced concrete

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20090376
  • Published on:
    25/01/2025
  • Last updated on:
    26/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine