0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1842
Completion: 1845
Status: demolished (1889)

Project Type

Structure: Chain suspension bridge
Function / usage: Road bridge

Location

Location: , ,
Crosses:
  • Neckar River
Replaced by: Friedrichsbrücke (1891)

Technical Information

Dimensions

span lengths 46.40 m - 92.80 m - 46.40 m
number of spans 3
roadway / carriageway width 5.30 m

Cost

cost of construction Guilder 372 000

Participants

Engineering

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20010180
  • Published on:
    03/09/2003
  • Last updated on:
    24/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine