0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 1996
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Kern River
Coordinates: 35° 22' 22.82" N    119° 3' 26.35" W
Show coordinates on a map

Technical Information

Cost

cost of construction United States dollar 3 500 000

Materials

piers reinforced concrete
girders steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20022796
  • Published on:
    17/09/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine