0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 22 March 1985
Status: out of service

Project Type

Location

Location: , ,
Part of:
Connects to: Kennedy Subway Station (1980)
Coordinates: 43° 43' 57.09" N    79° 15' 49.12" W
Show coordinates on a map

Technical Information

Dimensions

number of tracks 1
track gauge 1 435 mm

Excerpt from Wikipedia

Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 42881 customer trips a day.

It was built as part of the extensions east to Kipling and west to this station. The station's main complex consists of four floors with wheelchair accessible entrances. The ground level is the bus terminal surrounded with ten platforms that serve 16 Toronto Transit Commission (TTC) bus routes. Wi-Fi service is available at this station.

Kennedy station was previously the southern terminus of Line 3 Scarborough before it was permanently closed on July 24, 2023. The line was opened in 1985. The station's bus terminal is being expanded to handle replacement buses.

Construction to expand the station began in 2017 to add a platform for the future Line 5 Eglinton, which will terminate at the station when its first phase opens in 2024.

Station complex

The station is located south of Eglinton Avenue, east of Kennedy Road. The station complex consists of four levels. Trains of the former Line 3 Scarborough previously ascended via a bridge to the platform located at the top level of the station complex. The ground floor (third floor, but labelled 2 in the elevator) consists of ten bus platforms surrounding the main building. Three satellite pedestrian entrances to the station can be found at the South Parking Lot, next to the Don Montgomery Community Centre, and the passenger pick-up and drop-off roundabout on Transway Crescent. (A fourth entrance, at the service road of Eglinton Avenue, was demolished in 2018 and no longer exists.) Below the ground level is the concourse that spans the length of the station, connecting to all pedestrian entrances. Below the concourse is the platform for subway trains on the Line 2 Bloor–Danforth.

Four park and ride lots, that had a combined total of 729 spaces, used to be located around the station. As of August 21, 2023, these lots no longer exist.

Line 3 Scarborough

In 1985, Kennedy station was expanded to serve Line 3 Scarborough, an elevated light metro line with six stations. In 2023, Line 3 was decommissioned and is planned to be replaced by a Line 2 extension to Scarborough City Centre.

Although Line 3 trains had bidirectionally operated metro trains, the tracks for Line 3 extended beyond the top-floor platform into an above-ground turning loop, similar to those found on the Toronto streetcar system. This was because Line 3 had been planned as a dedicated right-of-way streetcar line rather than a metro line. As such, the top-floor platform was designed to operate streetcars. Line 3 was later built as a medium-capacity rail transport line to use the Intermediate Capacity Transit System train models built by Bombardier Transportation. The line began using two-car trains, which were able to travel along the turning loop, but was later converted to use four-car trains, which could not be operated along the tight loop. Thus, the use of the loop for reversals was discontinued after 1988, although the loop's elevated structure remains over the passenger pick-up and drop-off building and was occasionally used as a tail track to store trains. The station platform was reduced to a single track and began using the Spanish solution of unloading and boarding passengers at Kennedy. Original floor finishing and platform edge markings for the planned light rail can also be seen along the current tracks.

Line 3 trains originally looped at the west end of the station, which was double-tracked, but was converted to single track with the platforms on both sides now providing access to the reversing trains.

Text imported from Wikipedia article "Kennedy station" and modified on January 15, 2025 according to the CC-BY-SA 4.0 International license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20057789
  • Published on:
    16/08/2010
  • Last updated on:
    16/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine