General Information
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Girder bridge |
Location
Location: |
Bochum, North Rhine-Westphalia, Germany Hattingen, Ennepe-Ruhr-Kreis, North Rhine-Westphalia, Germany |
---|---|
Crosses: |
|
Near: |
Kemnade Weir (1979)
|
Coordinates: | 51° 24' 47.76" N 7° 15' 9.19" E |
Technical Information
Dimensions
total length | 146.32 m | |
span lengths | 30.80 m - 2 x 28.24 m - 30.80 m - 28.24 m | |
number of spans | 5 |
Cost
cost of construction | German Mark 2 600 000 |
Participants
Checking engineering
- Wolfgang Zerna (checking engineer)
Contractor
- Bilfinger Berger SE (foundations)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 380-381. (2004):
- About this
data sheet - Structure-ID
20021335 - Published on:
05/05/2006 - Last updated on:
05/02/2016