0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Keith Hay Park Pedestrian Bridge

General Information

Beginning of works: January 2006
Completion: 16 February 2007
Status: in use

Project Type

Location

Location: , ,
Coordinates: 36° 54' 50.46" S    174° 44' 45.72" E
Show coordinates on a map

Technical Information

Dimensions

length 170 m
deck width 4.2 m
pylon height 25 m
number 1

Cost

cost of construction New Zealand dollar 1 200 000

Materials

pylon steel
piers reinforced concrete
deck slab precast reinforced concrete

Chronology

January 2006

Beginning of construction.

16 February 2007

Opening.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20027053
  • Published on:
    28/02/2007
  • Last updated on:
    02/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine