General Information
Project Type
Function / usage: |
Railroad (railway) line |
---|
Location
km | Name |
Technical Information
Dimensions
total length | 30.5 km | |
number of stations | 9 |
Cost
cost of construction | Hong Kong dollar 46 200 000 000 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Arup and the Kowloon-Canton Railway. In: The Arup Journal, v. 41, n. 3 ( 2006), pp. 4-5. (2006):
- Kwai Tsing tunnels. In: The Arup Journal, v. 41, n. 3 ( 2006), pp. 35. (2006):
- Light rail transit. Tin Shui Wai extension. In: The Arup Journal, v. 41, n. 3 ( 2006), pp. 18-19. (2006):
- Piling in Yuen Long. A unique experience. In: The Arup Journal, v. 41, n. 3 ( 2006), pp. 20-22. (2006):
- Tai Lam tunnel. In: The Arup Journal, v. 41, n. 3 ( 2006), pp. 23. (2006):
- About this
data sheet - Structure-ID
10001023 - Published on:
06/01/2007 - Last updated on:
16/05/2015