0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2017
Completion: 2019
Status: project phase

Project Type

Function / usage: Bicycle and pedestrian bridge
Material: Steel bridge

Location

Location: , ,
Coordinates: 50° 2' 43.42" N    19° 56' 18.79" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072279
  • Published on:
    08/12/2016
  • Last updated on:
    04/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine