General Information
Project Type
Structure: |
Concrete-face rockfill dam |
---|---|
Function / usage: |
Hydroelectric dam / plant |
Location
Technical Information
Dimensions
height | 93 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Structural design measures for a 93 m high concrete-faced rockfill dam (CFRD) to cope with difficult geological conditions / Planung und Errichtung eines 93 m hohen Steinschüttdamms unter schwierigen geologischen Bedingungen. In: Geomechanics and Tunnelling, v. 5, n. 5 ( 2012), pp. 485-496. (2012):
- About this
data sheet - Structure-ID
20076462 - Published on:
26/12/2018 - Last updated on:
26/12/2018