0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 2014
Completion: December 2019
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
For: A 3 Motorway (Germany) (1984)
Coordinates: 49° 45' 18.80" N    9° 57' 11.54" E
Coordinates: 49° 45' 10.96" N    9° 56' 46.74" E
Show coordinates on a map

Technical Information

Dimensions

length 570 m
number of tubes 2
northern tube interior width 19.00 m
number of lanes 4
southern tube interior width 17.00 m
number of lanes 3

Design Loads

design speed 80 km/h

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20067909
  • Published on:
    15/10/2015
  • Last updated on:
    15/10/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine