General Information
Completion: | 1986 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Structure: |
Three-span cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Cable-stayed bridge with curved deck |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 220 m | |
total length | 455 m | |
span lengths | 40.5 m - 134 m - 220 m - 60.5 m | |
number of spans | 4 | |
deck | deck width | 23.5 m |
Quantities
structural steel | 7 100 t |
Materials
pylon |
steel
|
---|---|
deck |
steel
|
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20005416 - Published on:
23/09/2002 - Last updated on:
05/02/2016