General Information

Official designation: Bridge 508
Completion: 2004
Status: in use

Project Type

Function / usage: Road bridge

Location

Location: ,
,
Crosses:
  • Zambezi River
Coordinates: 17° 28' 19" S    24° 14' 58" E
Show coordinates on a map

Technical Information

Dimensions

length 900 m
number of spans 19

Excerpt from Wikipedia

The Katima Mulilo Bridge (also known as Bridge 508 in the Namibian Bridge Register) carries the TransCaprivi Highway over the Zambezi River between Katima Mulilo, Namibia and Sesheke, Zambia. It is a road bridge, completed in 2004, 900 metres long and with 19 spans. It links Namibia's Trans–Caprivi Highway to the Zambian road network, forming a section of the trade route from south-central Africa to the Atlantic known as the Walvis Bay Corridor. It also carries tourist traffic.

Pedestrians and passenger vehicles crossed the river nearby by ferry. Plans for the bridge, the only one over the Zambezi for hundreds of kilometers, were first considered in Namibia in 1982, and the number 508 was allocated to the project. However, the occupying South African government was opposed to the project and considered it an act of high treason to build a bridge to independent, racially not segregated, Zambia. The initiator of the planning, Klaus Dierks, was subsequently dismissed as Chief Bridge Engineer of the territory. Only after Namibian independence was planning resumed in 1990. The bridge was built on Zambian soil because Zambia was a least developed country at the time and thus qualified for a grant to build it, while Namibia did not have this status and would have had to repay a loan.

As the bridge was built on Zambian soil, it is entirely part of Zambia and is part of Zambia's M10 Route. When coming from the town of Sesheke, the entire bridge is crossed before the Namibia border immigration is reached.

In 2002 the contract for construction was awarded to Concor of South Africa and Hochtief of Germany, with the bridge completed on schedule in 2004. The bridge was constructed using the German technique of incremental launching (Taktschiebe-Verfahren), with the deck of the bridge constructed on location then hydraulically pushed segment-by-segment across the river.

The bridge was officially opened by the President of Namibia, Dr. Sam Nujoma, and President of Zambia, Levy Mwanawasa on 13 May 2004, in Katima Mulilo.

Text imported from Wikipedia article "Katima Mulilo Bridge" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.

Participants

Co-contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20035140
  • Published on:
    08/03/2008
  • Last updated on:
    05/02/2016