General Information
Name in local language: | Kanstadstraumen bru |
---|---|
Completion: | 12 December 1976 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
main span | 80 m | |
total length | 160 m |
Materials
deck |
precast concrete
|
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20008160 - Published on:
12/02/2003 - Last updated on:
17/10/2017