General Information
Completion: | 1873 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Vaulted arch bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! original configuration: Masonry bridge current configuration: Lightweight concrete bridge |
Location
Technical Information
Dimensions
width | 8.70 m | |
span lengths | 4 x 8.60 m | |
number of spans | 4 | |
roadway / carriageway width | 6.30 m | |
walkway width | 2 x 1.25 m | |
piers | width | 2.10 m |
Materials
piers |
stone
|
---|---|
arches |
stone
|
Notes
During restoration, the arches were replaced by lightweight agregate concrete vaults while respecting the historical appearance of the bridge. The use of lightweight concrete avoided the necessity to strengthen the foundations which normal-weight concrete would have required.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Light weight Concrete Applications in Latvian Bridges. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 198-199. (2004):
- About this
data sheet - Structure-ID
20011941 - Published on:
05/05/2004 - Last updated on:
05/02/2016