General Information
Project Type
Function / usage: |
Concert hall |
---|---|
Material: |
Reinforced concrete structure |
Location
Location: |
Berlin-Tiergarten, Mitte, Berlin, Germany |
---|---|
Address: | Herbert-von-Karajan-Straße |
Connects to: |
Berlin Philharmony (1963)
|
Coordinates: | 52° 30' 33.73" N 13° 22' 8.85" E |
Technical Information
Dimensions
seats | 1 065 | |
building volume | 108 000 m³ |
Materials
building structure |
reinforced concrete
|
---|
Participants
Architecture
- Hans Bernhard Scharoun (concept designer)
- Edgar Wisniewski (architect)
- Walter Hötzel (construction manager)
Landscape architecture
- Nagel (landscape architect)
Structural engineering
Checking engineering
- Glatthaar (checking engineer)
Co-contractor
- Gustav Pegel & Sohn GmbH & Co
- HOCHTIEF AG
- Krupp Industrietechnik GmbH
- Strabag AG
- Walter Thosti Boswau AG
Project controlling
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Architekturführer Berlin. 6th edition, Dietrich Reimer Verlag, Berlin (Germany), ISBN 978-3496012115, pp. 109. (2001):
- Philharmonie Kulturforum Berlin. Stadtwandelverlag, Berlin (Germany), pp. 31.
- About this
data sheet - Structure-ID
20019068 - Published on:
17/01/2006 - Last updated on:
10/06/2024