General Information
Completion: | 1908 |
---|---|
Status: | in use |
Project Type
Structure: |
Rigid frame bridge |
---|---|
Material: |
Reinforced concrete bridge |
Function / usage: |
original use: Road bridge current use: Bicycle and pedestrian bridge |
Location
Location: |
Lublin, Lublin Voivodeship, Poland |
---|---|
Crosses: |
|
Coordinates: | 51° 15' 7.95" N 22° 35' 41.59" E |
Technical Information
There currently is no technical data available.
Participants
Engineering
- Marian Lutosławski (engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20062527 - Published on:
08/12/2011 - Last updated on:
05/02/2016