General Information
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Construction method: |
Tunnel shield |
Structure: |
Tunnel with segmental lining |
Location
Location: |
Cochem, Cochem-Zell, Rhineland-Palatinate, Germany Ediger-Eller, Cochem-Zell, Rhineland-Palatinate, Germany |
---|---|
Next to: |
Kaiser-Wilhelm-Tunnel (1879)
|
Coordinates: | 50° 6' 40.99" N 7° 8' 36.67" E |
Coordinates: | 50° 8' 48.81" N 7° 9' 49.44" E |
Technical Information
Dimensions
length | 4 242 m | |
excavation diameter | 10.12 m | |
tubbings | interior diameter | 9 m |
exterior diameter | 9.8 m |
Participants
Owner
Client
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Kaiser Wilhelm Tunnel - mechanical tunnelling at the limits of experience / Kaiser-Wilhelm-Tunnel - Maschinenvortrieb im Grenzbereich der Erfahrungen. In: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011), pp. 562-568. (2011):
- Securing with soilfrac injections during tunnelling of the New Kaiser Wilhelm Tunnel in Cochem / Bestandssicherung mit Soilfrac-Injektionen beim Vortrieb des Neuen Kaiser-Wilhelm-Tunnels in Cochem. In: Geomechanics and Tunnelling, v. 6, n. 4 ( 2013), pp. 375-377.
- About this
data sheet - Structure-ID
20065882 - Published on:
15/01/2014 - Last updated on:
28/05/2021