General Information
Other name(s): | Kahaluo Jinsha River Bridge |
---|---|
Beginning of works: | 19 October 2020 |
Completion: | 2023 |
Status: | under construction |
Project Type
Structure: |
Single-span two-tower suspension bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 1 030 m | |
total length | 1 776 m | |
span lengths | 7 x 41 m - 1 030 m - 11 x 41 m | |
on-axis distance between cables at top of towers | 28 m | |
on-center spacing between suspenders | 13.8 m | |
cables | span lengths | 326 m - 1 030 m - 326 m |
Materials
pylons |
composite steel-reinforced concrete
|
---|---|
deck truss |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2021): Slope stability analysis and protection of deep accumulation excavation foundation pit in the Sichuan Bank of the Kahalo Jinsha River Bridge. In: IOP Conference Series: Earth and Environmental Science, v. 861, n. 6 (October 2021), pp. 062042.
- (2022): Study on Anchorage Type Selection of Sichuan Bank of Sichuan Kahalo Jinsha River Bridge. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022.