0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Kabavu Footbridge (Ruhanga)

General Information

Beginning of works: 23 January 2023
Completion: 17 April 2023
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Kabavu river.
Coordinates: 2° 21' 0" S    29° 25' 0" E
Show coordinates on a map

Technical Information

Dimensions

span 68 m

Materials

cables steel wire
deck steel
pylons steel

Notes

The bridge built by Bridges to Prosperity serves around 2010 people in the communities of Gishenge, Kibuga, Ruhanga, and Bimba.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088226
  • Published on:
    11/04/2024
  • Last updated on:
    11/04/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine