Other name(s): Überführung der K58
Official designation: BW 128a
Beginning of works: May 1994
Completion: April 1995
Duration of works: 11 months
Status: in use

Project Type

Location

Location: , , ,
Address: K 58
Crosses:
  • Autobahn A2
Part of:
Coordinates: 52° 18' 42.89" N    10° 45' 36.12" E
Show coordinates on a map

Technical Information

Dimensions

total length 65.80 m
span lengths 31.20 m - 34.60 m
number of spans 2
bridge surface 773 m²
deck deck width 11.75 m
girders height 1.55 - 1.60 m
web thickness 0.55 m

Quantities

abutments concrete volume 720 m³
reinforcing steel 31.20 t
deck slab concrete volume 229 m³
prestressing steel 2.57 t
reinforcing steel 25.93 t
foundation slab concrete volume 435 m³
reinforcing steel 28.74 t
girders concrete volume 352 m³
prestressing steel 22.05 t + 9.91 t
reinforcing steel 33.96 t
piers concrete volume 110 m³
reinforcing steel 6.18 t

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction German Mark 3 200 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders precast prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001169
  • Published on:
    15/12/2000
  • Last updated on:
    07/12/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine