0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Justice Harlan Fiske Stone Bridge

General Information

Other name(s): Chesterfield-Brattleboro Bridge
Completion: 2 August 1937
Status: out of service

Project Type

Structure: Half-through arch bridge
Material: Steel bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Support conditions:
Function / usage: original use:
Road bridge
current use:
Bicycle and pedestrian bridge

Awards and Distinctions

1937 First Place  

Location

Location: , , ,
, , ,
Crosses:
  • Connecticut River
Replaced by: United States Navy Seabees Bridge (2003)
Coordinates: 42° 53' 2.50" N    72° 33' 6.29" W
Show coordinates on a map

Technical Information

Dimensions

main span 127.71 m
total length 134.11 m
deck deck width 7.32 m

Cost

cost of construction United States dollar 198 452.72

Materials

deck steel
arches steel

Participants

Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080910
  • Published on:
    01/04/2021
  • Last updated on:
    06/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine