0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2009
Completion: 14 August 2011
Status: in use

Project Type

Location

Location: , ,
Coordinates: 7° 38' 25.90" S    72° 40' 4.93" W
Show coordinates on a map

Technical Information

Dimensions

number of lanes 2
main bridge
total length 225 m
span lengths 110 m - 115 m
number of spans 2

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20067602
  • Published on:
    27/08/2015
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine