General Information
Completion: | 1997 |
---|---|
Status: | in use |
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Reinforced concrete bridge |
Location
Location: |
Navi Mumbai, Maharashtra, India |
---|---|
Coordinates: | 19° 3' 25.88" N 73° 1' 9.60" E |
Technical Information
Dimensions
arch span | 65 m |
Materials
arch |
reinforced concrete
|
---|
Participants
Design
Construction supervision
Project management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2017): Changing Paradigm of Indian Footbridges: From Connectors to Destinations. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- About this
data sheet - Structure-ID
20010626 - Published on:
08/11/2003 - Last updated on:
16/12/2017