General Information
Other name(s): | Gabriel Johnson Tucker Bridge |
---|---|
Beginning of works: | 1975 |
Completion: | 1978 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 426.72 m | |
span lengths | 53.34 m - 3 x 106.68 m - 53.34 m | |
number of spans | 5 | |
deck | deck depth | 1.83 - 4.78 m |
deck width | 14.021 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les grands ponts du monde: Hors d'Europe. Brissaud, Poitiers (France), pp. 29. (1990):
- Liberia - Johnson Street Bridge à Monrovia. In: Bulletin annuel AFPC ( 1978- 1979), pp. 169-172.
- Pont de Johnson Street au Libéria. Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 48.
- About this
data sheet - Structure-ID
20003194 - Published on:
05/03/2002 - Last updated on:
02/01/2018