General Information
Name in local language: | 济南黄河大桥 (Jǐnán Huánghé Dà Qiáo) |
---|---|
Other name(s): | Jinan Yellow River Highway Bridge |
Beginning of works: | 15 December 1978 |
Completion: | 14 July 1982 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Three-span cable-stayed bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Jinan, Shandong, China |
---|---|
Crosses: |
|
Coordinates: | 36° 45' 20.28" N 117° 1' 55.19" E |
Technical Information
Dimensions
total length | 2 023.44 m | |
main bridge | ||
---|---|---|
total length | 488 m | |
span lengths | 40.00 m - 94.00 m - 220.00 m - 94.00 m - 40.00 m | |
number of spans | 5 | |
deck | deck depth | 2.75 m |
deck width | 17.20 m | |
pylons | pylon height | 68.40 m |
Design Loads
live load | Truck-20 / Trailer-100 |
Materials
cables |
steel
|
---|---|
deck |
prestressed concrete
|
pylons |
reinforced concrete
|
Excerpt from Wikipedia
The Jinan Yellow River Bridge (Chinese: 济南黄河大桥; pinyin: Jǐnán Huánghé Dà Qiáo), also known as the Jinan Yellow River Highway Bridge (Chinese: 济南黄河公路桥; pinyin: Jǐnán Huánghé Gōnglù Qiáo), is a cable-stayed road bridge across the Yellow River in the city of Jinan, Shandong Province, China.
The national State Planning Commission authorized the plan to construct the Jinan Yellow River bridge on December 10, 1977. In February 1978, engineers Li Shou (Chinese: 李守; pinyin: Lǐ Shŏu) and Wan Shanshan (Chinese: 万珊珊; pinyin: Wàn Shānshān) from the Communication Planning and Design Institute of Shandong Province started to work on the design. In September of the same year, the preliminary design was approved by the Shandong Province construction committee. Test boring at the construction site commenced in July 1978. Work on the bridge proper started officially on December 15, 1978, the bridge assembly was in place by December 1981, and construction was completed on June 30, 1982. Work was carried out by the Communication Engineering Company of Shandong Province. It was supervised by assistant directors Song Ren and Wang Liang as well as assistant commissioner Du Henggan from the department of transportation. The bridge was opened to traffic on July 14, 1982. It was one of the first long-span cable-stayed road bridges in China. The total construction cost was 35,180,000 Yuan RMB. By 1990, the daily average traffic volume had reached 14,179 vehicles (for a 24hour period).
The bridge design has a semi-fan arrangement with steel cables and reinforced concrete H-pylons. The bridge has a total of five spans with the lengths: 40 metres (130 ft) - 94 metres (308 ft) - 220 metres (720 ft) - 94 metres (308 ft) - 20 metres (66 ft). The deck is 17.2 metres (56 ft) wide and 2.75 metres (9 ft 0 in) deep. The pylons are 68.4 metres tall. Together with the access ramps, the bridge has a total length of 2,022.8 metres (6,636 ft).
Text imported from Wikipedia article "Jinan Yellow River Bridge" and modified on April 11, 2020 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Schrägseilbrücken. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), pp. 39. (1986):
- 中国桥谱 / A Guide to Chinese Bridges. 1st edition, 外文出版社 (Foreign Languages Press), Beijing (China), 2003, pp. 578-579.
- About this
data sheet - Structure-ID
20001871 - Published on:
30/08/2001 - Last updated on:
19/05/2023