General Information
Completion: | 2010 |
---|---|
Status: | in use |
Project Type
Structure: |
main bridge: Multiple-span cable-stayed bridge |
---|---|
Function / usage: |
main bridge: Motorway bridge / freeway bridge |
Material: |
main bridge: Prestressed concrete bridge |
Structure: |
main bridge: Cable-stayed bridge with semi-fan system |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Structure: |
secondary span: Tied-arch bridge |
Location
Location: |
Jinan, Shandong, China |
---|---|
Crosses: |
|
Coordinates: | 36° 44' 10.46" N 116° 55' 43.20" E |
Technical Information
Dimensions
total length | 2 145 m | |
main bridge | ||
---|---|---|
main spans (2x) | 300 m |
Materials
pylons |
reinforced concrete
|
---|---|
deck of main bridge |
prestressed concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20078971 - Published on:
03/01/2020 - Last updated on:
03/01/2020