General Information
Completion: | 2017 |
---|---|
Status: | in use |
Project Type
Material: |
Steel bridge |
---|---|
Structure: |
Structurae Plus/Pro - Subscribe Now! Through truss bridge Self-anchored suspension bridge with discontinuous cables |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Road bridge lower deck: High-speed rail bridge |
Location
Location: |
Jinan, Shandong, China |
---|---|
Crosses: |
|
Coordinates: | 36° 46' 45.94" N 117° 4' 39.68" E |
Technical Information
Dimensions
total length | 14 032 m | |
main spans (3x) | 180 m |
Materials
pylons |
steel
|
---|---|
truss |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- China's first road-cum-railway suspension bridge with rigid-cables of three main stiffening frames in parallel: The two-storey Jinan Yellow River Bridge. In: Stahlbau, v. 87, n. 3 (March 2018), pp. 203-214. (2018):
- About this
data sheet - Structure-ID
20078968 - Published on:
03/01/2020 - Last updated on:
03/01/2020