General Information
Name in local language: | 嘉绍跨海大桥 (Jiā Shào Kuà Hǎi Dàqiáo) |
---|---|
Other name(s): | Jiaxing-Shaoxing Bridge |
Beginning of works: | December 2008 |
Completion: | 17 June 2013 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Multiple-span cable-stayed bridge Cable-stayed bridge with semi-fan system |
Support conditions: |
for registered users |
Material: |
Steel bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Jiaxing, Zhejiang, China |
---|---|
Crosses: |
|
Coordinates: | 30° 12' 59.87" N 120° 46' 20.42" E |
Coordinates: | 30° 18' 7.13" N 120° 46' 32.24" E |
Technical Information
Dimensions
total length | 10 138 m | |
number of lanes | 8 | |
main bridge | ||
---|---|---|
width | 55.6 m | |
total length | 2 680 m | |
span lengths | 70 m - 200 m - 5 x 428 m - 200 m - 70 m | |
number of spans | 9 | |
pylons | height | 227 m |
Cost
cost of construction | Renminbi Yuan 13 900 000 000 |
Materials
deck |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Geometric Closure Control of the Main Channel Girder of Jiaxing-Shaoxing Bridge. In: Journal of Highway and Transportation Research and Development (English Edition), v. 9, n. 1 (March 2015), pp. 63-70. (2015):
- (2015): Traffic characteristics and load responses of specific bridge based on the measured WIM data. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 1354-1359.
- About this
data sheet - Structure-ID
20041269 - Published on:
15/12/2008 - Last updated on:
13/10/2016