General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
main bridge: Self-anchored suspension bridge |
Material: |
main bridge: Steel bridge approach viaducts: Prestressed concrete bridge |
Structure: |
secondary span: Girder bridge |
Construction method: |
secondary span: Balanced cantilever method |
Location
Location: |
Hangzhou, Zhejiang, China |
---|---|
Crosses: |
|
Coordinates: | 30° 19' 11.42" N 120° 24' 33.16" E |
Technical Information
Dimensions
width | 47 m | |
total length | 4 332 m | |
main bridge 1 | ||
---|---|---|
total length | 426 m | |
span lengths | 83 m - 260 m - 83 m | |
number of spans | 3 | |
main bridge 2 | ||
total length | 343 m | |
span lengths | 91.5 m - 190 m - 91.5 m | |
number of spans | 3 | |
main bridge 3 | ||
total length | 426 m | |
span lengths | 83 m - 260 m - 83 m | |
number of spans | 3 |
Quantities
structural steel | 11 000 t | |
concrete volume | 36 000 m³ |
Cost
cost of construction | Renminbi Yuan 1 890 000 000 |
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hangzhou Jiangdong Bridge Designed as a Spatial Self-Anchored Suspension Bridge, China. In: Structural Engineering International, v. 20, n. 3 (August 2010), pp. 303-307. (2010):
- About this
data sheet - Structure-ID
20045476 - Published on:
18/06/2009 - Last updated on:
05/02/2016