General Information
Completion: | 2005 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Prestressed concrete bridge |
Location
Location: |
Dalseong County, South Gyeongsang, South Korea |
---|
Technical Information
Dimensions
total length | 600 m | |
span lengths | 12 x 50 m | |
number of spans | 12 | |
deck | deck width | 2 x 12.245 m |
Quantities
prestressing steel | 311 t |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
prestressed concrete
|
Participants
Owner
Design
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20010755 - Published on:
28/11/2003 - Last updated on:
05/02/2016