0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 23 October 2017
Completion: October 2018
Status: in use

Project Type

Location

Location: , , ,
Replaces: Jägerstieg I (2001)
Crosses: A 4 Motorway (Germany)
Coordinates: 50° 51' 56.57" N    11° 44' 42.24" E
Show coordinates on a map

Technical Information

Dimensions

total length 83.66 m
span lengths 17.30 m - 4.71 m - 41.10 m - 3.97 m - 16.58 m
number of spans 5
bridge surface 209 m²
on-center distance between girders 3.10 m
total width 3.30 m
superelevation 2.5 %
walkway length 2.50 m
truss height 2.40 m

Quantities

ramps structural steel 36 t
substructure concrete volume 400 m³
reinforcing steel 59 t
truss structural steel 42 t

Cost

cost of construction Euro 1 710 000

Materials

piers steel (S 355 J2+N)
truss steel (S 355 J2+N)
abutments reinforced concrete (C 35/45)
deck flooring steel
ramps steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20080952
  • Published on:
    07/04/2021
  • Last updated on:
    07/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine