General Information

Beginning of works: January 1970
Completion: 5 May 1984
Status: in use

Project Type

Location

Location: , ,
, ,
Impounds:
  • Paraná River
Coordinates: 25° 24' 29" S    54° 35' 20" W
Show coordinates on a map

Technical Information

Dimensions

height 196 m
crest length 7 919 m
base thickness 273 m
spillway capacity 62 200 m³/s
capacity for electric power generation 12 600 MW

Quantities

dam-fill volume 15 000 000 m³

Materials

dam structure reinforced concrete
roller-compacted concrete

Chronology

5 May 1984

First two power generators go on-line.

9 April 1991

The last of 18 power generators goes on-line.

2001 — 2004

Installation and manufacture of another 2 power generators.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001072
  • Published on:
    05/10/2000
  • Last updated on:
    29/07/2014