0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Islisbergtunnel
Beginning of works: 2003
Completion: 2009
Status: in use

Project Type

Function / usage: Road tunnel
Construction method: Tunnel boring machine (TBM)
Structure: Tunnel with segmental lining

Location

Location: ,
,
Coordinates: 47° 17' 46.06" N    8° 25' 42.41" E
Coordinates: 47° 20' 5.67" N    8° 27' 34.63" E
Show coordinates on a map

Technical Information

Dimensions

tunnel section area 110 m²
exterior diameter 11.85 m
on-axis distance between tubes 25 m
eastern tube length 4 645 m
western tube length 4 680 m

Quantities

excavated material 1 100 000 m³

Cost

cost of construction Swiss Franc 500 000 000

Chronology

21 May 2005

Breakthrough of western tube.

2006

Breakthrough of eastern tube.

13 November 2009

Opened to traffic.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043704
  • Published on:
    20/02/2009
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine