General Information
Project Type
Structure: |
Truss |
---|---|
Function / usage: |
Stadium / Arena |
Material: |
Prestressed concrete structure |
Location
Technical Information
Dimensions
height | max. 51.84 m | |
seats | 72 370 | |
building area | 67 050 m² |
Materials
roof truss |
steel
|
---|---|
building structure |
precast prestressed concrete
|
Chronology
August 1991
— October 1993 |
Planning period. |
---|---|
1 March 1998 | First use. |
June 2002 | One of the Fifa World Cup 2002 venues. |
Participants
Co-contractor
- Miki (fourth section)
- Nara Construction (first section)
- Nippon Kokudo (third section)
- Nippon Tubing (second section)
- Sato (fourth section)
- Suruga (foundations)
- Takenaka Corporation (first section)
- Watanabe Construction (third section)
- Zenidaka (second section)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20003439 - Published on:
01/06/2002 - Last updated on:
29/07/2014