General Information
Project Type
Structure: |
Single-leaf bascule bridge |
---|---|
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
approach viaducts: Prestressed concrete bridge |
Structure: |
approach viaducts: Multiple T-section girder bridge |
Construction method: |
approach viaducts: Precast girders with cast-in-situ slab |
Material: |
bascule span: Steel bridge |
Location
Location: |
Mykolaiv, Mykolaiv Oblast, Ukraine |
---|---|
Coordinates: | 46° 58' 47.22" N 31° 59' 22.88" E |
Technical Information
Dimensions
main span | 76.25 m | |
width | 18.5 m | |
total length | 422 m | |
span lengths | 5 x 33 m - 76.25 m - 7 x 33 m | |
number of spans | 13 | |
number of lanes | 2 x 2 |
Materials
piers |
reinforced concrete
|
---|---|
deck of approach viaducts |
prestressed concrete
|
abutments |
reinforced concrete
|
bascule span |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20082441 - Published on:
06/03/2022 - Last updated on:
06/03/2022