General Information
Other name(s): | North Shore Footbridge |
---|---|
Beginning of works: | June 2007 |
Completion: | 16 May 2009 |
Status: | in use |
Project Type
Structure: |
Through arch bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel bridge |
Location
Location: |
Stockton-on-Tees, County Durham, North East England, England, United Kingdom |
---|---|
Crosses: |
|
Coordinates: | 54° 33' 52.96" N 1° 17' 57.10" W |
Technical Information
Dimensions
main span | 120 m | |
length | 272 m | |
span lengths | 60 m - 120 m | |
number of spans | 2 | |
arch | height above valley floor or water | max. 40 m |
Materials
arches |
steel
|
---|
Participants
Architecture
Structural design
Contractor
Steel construction
Subcontractor
Steel supplier
Construction management
Lighting
Relevant Web Sites
Relevant Publications
- First moves. In: Bridge Update, n. 76 (June 2008), pp. 2.
- Infinite wisdom. In: Bridge Design & Engineering, v. 15, n. 55 (2nd Quarter 2009), pp. 14.
- (2014): Old, new, dark blue - the art of lighting of footbridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014, pp. 100-111.
- Public support not enough to win the day. In: Bridge Design & Engineering, v. 9, n. 33 (4th Quarter 2003), pp. 8. (2003):
- True blue. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 15.
- About this
data sheet - Structure-ID
20010615 - Published on:
07/11/2003 - Last updated on:
05/02/2016