General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Geisingen, Tuttlingen (Kreis), Baden-Württemberg, Germany |
---|---|
Part of: | |
Coordinates: | 47° 53' 33.93" N 8° 42' 42.68" E |
Technical Information
Dimensions
total length | 227 m | |
bridge surface | 6 976.85 m² | |
total width | 31.10 m | |
Northern bridge | ||
---|---|---|
span lengths | 46.719 m - 54.67 m - 69.58 m - 54.67 m | |
number of spans | 4 | |
deck | deck depth | 2.95 m |
deck width | 14.80 m | |
deck slab thickness | 0.28 - 0.45 m | |
roadway / carriageway width | 12.00 m | |
Southern bridge | ||
span lengths | 47.318 m - 55.371 m - 70.473 m - 55.37 m | |
number of spans | 4 | |
deck | deck depth | 2.95 m |
deck width | 14.80 m | |
deck slab thickness | 0.28 - 0.45 m | |
roadway / carriageway width | 12.00 m |
Design Loads
design code(s) | DIN Fachbericht 101 | |
military load class | 50/50 - 100 [STANAG 2021] |
Cost
cost of construction | Euro 15 000 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|
Participants
Owner
Client
Structural engineering
Co-contractor
Formwork
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20074621 - Published on:
22/01/2018 - Last updated on:
24/06/2020