0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Bahonar Boulevard Bridge
Completion: 2013
Status: in use

Project Type

Location

Location: , ,
Coordinates: 36° 18' 5.87" N    49° 59' 14.48" E
Show coordinates on a map

Technical Information

Dimensions

main span 48 m
total length 262 m
number of spans 11

Participants

Construction supervision

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20081889
  • Published on:
    26/11/2021
  • Last updated on:
    26/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine