General Information
Official designation: | Bridge 9340 |
---|---|
Completion: | November 1967 |
Status: | collapsed (1 August 2007) |
Project Type
Structure: |
Cantilever truss bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Location
Location: |
Minneapolis, Hennepin County, Minnesota, USA |
---|---|
Address: | Interstate 35W |
Crossed: |
|
Replaced by: |
I-35W Saint Anthony Falls Bridge (2008)
|
Coordinates: | 44° 58' 45" N 93° 14' 43" W |
Technical Information
Dimensions
main span | 140 m | |
total length | 581 m |
Materials
truss |
steel
|
---|
Chronology
1 August 2007, 18:05 | In a catastrophic and complete collapse of the bridge during rush hour, thirteen people are killed and 150 are injured |
---|
Participants
Relevant Web Sites
Relevant Publications
- The Causes of the I-35 West Bridge Collapse. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- First moves to learn from Minneapolis. In: Bridge Design & Engineering, n. 49 (4th Quarter 2007), pp. 10-12.
- I-35W probe highlights gusset plates. In: Bridge Design & Engineering, v. 14, n. 50 (1st Quarter 2008), pp. 11.
- I35W collapse caused by original design fault. In: Bridge Update, n. 80 (December 2008), pp. 2.
- About this
data sheet - Structure-ID
20029659 - Published on:
02/08/2007 - Last updated on:
27/01/2022