General Information
Other name(s): | Geh- und Radweg-Überführung über die Hüttentalstraße |
---|---|
Beginning of works: | November 1993 |
Completion: | May 1996 |
Duration of works: | 30 months |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Pony truss bridge |
Location
Location: |
Siegen, Siegen-Wittgenstein, North Rhine-Westphalia, Germany |
---|---|
Address: | Hüttentalstraße (B54) |
Coordinates: | 50° 52' 39.69" N 8° 1' 4.38" E |
Technical Information
Dimensions
total length | 59.00 m | |
span lengths | 17.50 m - 24.00 m - 17.50 m | |
number of spans | 3 | |
bridge surface | 177 m² | |
deck | deck width | 3.00 m |
Quantities
deck | structural steel | 56.50 t |
foundations | concrete volume | 85.00 m³ |
substructure | concrete volume | 207.00 m³ |
reinforcing steel | 27.80 t |
Design Loads
live load | 5 kN/m² | |
design code(s) | DIN 1072 |
Cost
cost of construction | German Mark 913 000 |
Materials
substructure |
reinforced concrete
|
---|---|
truss |
steel
|
Participants
Owner
Client
Structural engineering
- Iemants nv (superstructure)
- Köhler + Seitz Beraten und Planen GmbH (substructure)
Soil investigation report
Checking engineering
- Reinhard Ruhrberg (checking engineer)
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1999. Verkehrsblatt-Verlag, Dortmund (Germany), 1999, pp. 81-94.
- About this
data sheet - Structure-ID
20001187 - Published on:
17/12/2000 - Last updated on:
06/05/2016