General Information

Beginning of works: 1990
Completion: 1992
Status: in use

Project Type

Location

Location: , ,
Coordinates: 47° 21' 42.19" N    9° 18' 8.61" E
Show coordinates on a map

Technical Information

Dimensions

length 268.80 m
arch span 143 m
bridge surface 3 000 m²

Quantities

concrete volume 5 300 m³
prestressing steel 25 t
reinforcing steel 600 t

Cost

cost of construction Swiss Franc 14 000 000

Materials

arch composite steel-reinforced concrete

Notes

The scaffolding for the arch was constructed by assembling in two halves and rotating at the springing to join the two parts. The arch was then concreted around the scaffolding using formwork wagons so that the steel scaffold is encased in the concrete and acts inside the concrete arch.

Participants

Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009071
  • Published on:
    19/04/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine