General Information
Name in local language: | Hugo-Preuß-Brücke; Spreeuferbrücke |
---|---|
Beginning of works: | 2002 |
Completion: | 2004 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Steel bridge |
Location
Location: |
Berlin-Moabit, Mitte, Berlin, Germany Berlin-Mitte, Mitte, Berlin, Germany |
---|---|
Coordinates: | 52° 31' 24.84" N 13° 22' 19.76" E |
Technical Information
Dimensions
total length | 88.50 m | |
total width | 24.00 m | |
deck | girder depth | 3.30 - 4.10 m |
number of lanes | 2 x 2 | |
roadway / carriageway width | 2 x 6.25 m | |
walkway width | 2 x 6.00 m |
Quantities
structural steel | 1 400 t |
Cost
cost of construction | Euro 7 800 000 |
Materials
girder |
steel
|
---|
Participants
Steel construction
Relevant Web Sites
- About this
data sheet - Structure-ID
20015548 - Published on:
22/03/2005 - Last updated on:
06/06/2023