0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Huangbai River Bridge
Beginning of works: 1994
Completion: 1996
Status: in use

Project Type

Location

Location: , ,
See also: Xialaoxi Bridge (1996)
Coordinates: 30° 46' 2.58" N    111° 16' 55.84" E
Show coordinates on a map

Technical Information

Dimensions

main span 160 m
total length 276.71 m
arches diameter 1.000 m
rise 32 m
deck width 18.50 m
span lengths 4 x 20 m - 13 m - 14 x 10 m - 13 m - 20 m
number of spans 21

Materials

piers reinforced concrete
arches concrete-filled steel section
abutments reinforced concrete
piers on arch steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001851
  • Published on:
    29/08/2001
  • Last updated on:
    27/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine