General Information

Other name(s): Volcano Bridge
Completion: 27 October 2012
Status: in use

Project Type

Location

Location: ,
Coordinates: 23° 0' 50.30" N    120° 34' 32.04" E
Show coordinates on a map

Technical Information

Dimensions

width 12 m
total length 280 m
number of spans 3

Cost

cost of construction 547 000 000

Materials

cables steel wire
chains steel
pylons steel
deck slab reinforced concrete
girders steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084507
  • Published on:
    15/01/2023
  • Last updated on:
    17/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine