General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Heilbronn, Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Coordinates: | 49° 7' 13.42" N 9° 10' 59.75" E |
Technical Information
Dimensions
main span | 96 m | |
total length | 384 m | |
number of spans | 7 | |
bridge surface | 4 375 m² | |
deck | deck depth | 2.0 - 4.2 m |
deck width | 13.10 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Alternative design
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006258 - Published on:
15/10/2002 - Last updated on:
18/06/2022