0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Hopfenbergtunnel
Beginning of works: 2002
Completion: 2005
Duration of works: 36 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , , ,
For:
  • Autobahn A44
Part of:
Coordinates: 51° 11' 40.44" N    9° 45' 54.38" E
Coordinates: 51° 11' 37.58" N    9° 46' 22.19" E
Show coordinates on a map

Technical Information

Dimensions

tunnel section area 56.44 m²
northern tube tunnel length 544 m
southern tube tunnel length 539 m
vault thickness 35 - 60 cm

Quantities

concrete volume 13 578 m³
reinforcing steel 1 208 t
excavated material 166 846 m³
water proofing 23 250 m²

Materials

tunnel structure reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007587
  • Published on:
    05/01/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine