General Information
Other name(s): | Homestead Grays Bridge |
---|---|
Completion: | 1936 |
Status: | in use |
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Wichert truss bridge |
Material: |
Steel bridge |
Structure: |
Continuous truss bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2001 |
for registered users |
---|---|
1986 |
for registered users |
Location
Location: |
Pittsburgh, Allegheny County, Pennsylvania, USA Homestead, Allegheny County, Pennsylvania, USA |
---|---|
Crosses: |
|
Coordinates: | 40° 24' 39" N 79° 55' 7" W |
Technical Information
Dimensions
main span | 157.4 m | |
total length | 1 140 m | |
number of lanes | 2 x 2 |
Materials
piers |
steel
|
---|---|
deck truss |
steel
|
Excerpt from Wikipedia
The Homestead Grays Bridge, also known as the (Homestead) High Level Bridge, was built in 1936 and spans the Monongahela River between Homestead Borough and the southernmost tip of Pittsburgh's Squirrel Hill neighborhood. It is notable as the first bridge to incorporate the Wichert Truss, which uses a quadrilateral shape over each support, into its design. This made the truss statically determinate, so that forces in the structural members could be calculated.
History
The bridge was dedicated on Saturday November 20, 1937, having cost the county of Allegheny $2.75 million to build and originally carried four highway lanes and two streetcar tracks of Pittsburgh Railways Company. It replaced the 1897 Brown's Bridge (Homestead and Highland Bridge) which was upstream and had linked Brown's Hill Rd on the north bank and Second Avenue between Ann Street and Amity Street, Homestead on the south bank.
On July 11, 2002, the Homestead High-Level Bridge was renamed the Homestead Grays Bridge in honor of the Homestead Grays baseball team.
The bridge had grown dilapidated since its last renovation in 1979. In 2006 and 2007 work was undertaken to rehabilitate the bridge: the deck was removed and the structure stripped down to the steel, then the steel structure repaired and a new, wider deck put on. The new deck is six feet wider in traffic lanes—three feet on each side—and also has broader pedestrian walkways. The railings and lighting were replaced with reproductions of historic models, and the entire structure received a new coat of blue-grey paint.
Text imported from Wikipedia article "Homestead Grays Bridge" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20006103 - Published on:
11/10/2002 - Last updated on:
26/04/2023