0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: March 1982
Completion: 21 September 1982
Status: in use

Project Type

Function / usage: Bicycle and pedestrian bridge
Structure: Pontoon bridge

Location

Location: , ,
Crosses:
  • Ruhr River
Coordinates: 51° 25' 45.45" N    7° 5' 51.56" E
Show coordinates on a map

Technical Information

Dimensions

total length 84.00 m
span lengths 21.00 m - 42.00 m - 21.00 m
number of spans 3

Participants

Checking engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20021345
  • Published on:
    05/05/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine