General Information
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Steel bridge Composite material bridge |
Location
Location: |
Reinbek, Stormarn, Schleswig-Holstein, Germany |
---|---|
Address: | Hamburger Straße |
Coordinates: | 53° 30' 37.16" N 10° 14' 5.21" E |
Technical Information
Dimensions
width | 3.5 m | |
length | 98 m | |
span lengths | 2 x 12.00 m - 16.0 m - 18.0 m - 12.0 m | |
number of spans | 5 | |
on-center distance between girders | 1.500 m |
Materials
deck slab |
glass-fiber-reinforced polymer (GFRP)
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Hollaenderbruecke. Economic and architecturally sophisticated design employing steel and GFRP. In: Steel Construction, v. 1, n. 1 ( 2008), pp. 34-41. (2008):
- About this
data sheet - Structure-ID
20043136 - Published on:
20/01/2009 - Last updated on:
05/02/2016